Downloads

Power Point Introduction

LS_2001.ppt

This file gives a general overview of our design philosophy and the engineering aspects that have been incorporated into our products.

General Technical Information

Using 208 Volt Pumps on 240 Volt Systems

I spent 8 years working as a power engineer for a local utility company. This issue came up several times and I decided to write this paper addressing the issue. This should also answer the question of using 240 volt pumps on 208 volt systems. Protect your pumps!

Sensaphone 1400.pdf

This file is the users manual for the Phonetics Sensaphone 1400 Alarm Dialer

HOA.pdf

This file shows how to interface the H.O.A. switch on a combination starter to the LS-2001 series of control panels.

Franklin Electric Engineering Manual

This file is one of the finest engineering manuals regarding submersible well pumps that I have seen. Thank You Franklin Electric!

Water Station Info

Hydro-Pneumatic Application

HydroProbe_Setup.pdf

This file shows how to set up your Probe Housing for Hydro-Pneumatic applications. This diagram shows the operation of these probes when interfaced to a WS-H2001 U-Tap Controller. This application prevents your hydro tank from over airing when applied as shown.

Probe setup.pdf

This file is a narrative step procedure for a station operator to properly configure the probe and pressure settings for a hydro tank.

Hydro_users.pdf

This file is the users/operators manual for hydro-pneumatic systems. It shows how easy it is for the operator to change settings and/or add pumps.

TB1 Typical_Hydro.pdf

This file lays out the external wiring needed to bring the panel into operation for a 2 pump hydro-pneumatic operation. The wiring is straight forward and can be done by any qualified operator or electrician.

Elevated Storage Applications

elevated_users.pdf

This file is the users/operators manual for elevated storage systems. It shows how easy it is for the operator to change settings and/or add pumps.

TB1 External Wiring4P_F.pdf

This file lays out the external wiring needed to bring the panel into operation for a 4 pump system. The wiring is straight forward and can be done by any qualified operator or electrician. This particular panel alternates up to 4 wells and associated chlorine pumps. A standard 4-20ma,0-100psi pressure(guage) transducer is all that is needed to bring the panel into operation.

Ground Storage Applications

Ground Storage User's Manual

This file shows how easy out panel is to set up and operate.

Lift Station Info

Float Lift Station Applications

Lift Station User's Manual

This file shows how easy our panel is to set up and operate.

LSF2001layout.pdf

This file shows how to field wire the LS-F2001 using combination starters or your existing starters.

TB1_ExternalFloat.pdf

This file lays out the external wiring needed to bring the panel into operation for a 2 pump float based operation. The wiring is straight forward and can be done by any qualified operator or electrician.